Campus School Centre Isny im Allgäu New construction of Rainsporthalle and refectory

Campus Schulzentrum Isny im Allgäu (1) © 2008 Freiraumplanung Sigmund

1 / 3

Campus Schulzentrum Isny im Allgäu (2) © 2008 Freiraumplanung Sigmund

2 / 3

Campus Schulzentrum Isny im Allgäu (3) © 2008 Freiraumplanung Sigmund

3 / 3

Campus Schulzentrum Isny im Allgäu (1) © 2008 Freiraumplanung Sigmund

Campus Schulzentrum Isny im Allgäu (2) © 2008 Freiraumplanung Sigmund

Campus Schulzentrum Isny im Allgäu (3) © 2008 Freiraumplanung Sigmund

In the course of the construction of the new refectory and Rainsporthalle, the surrounding open spaces on the campus were redesigned. The most important thing here was the creation of exercise areas for students with recreation rooms and various outdoor sports facilities. In addition to the existing sports field, children and young people can now play, train and let off steam on an additional small sports field and a streetball facility. The elongated seating steps as well as the loosely distributed boulders offer seating possibilities for recreation during breaks.

Read more +

Planning offices

Open space planning Sigmund Landschaftsarchitekten GmbH
Grafenberg

GMS Freie Architekten
Isny im Allgäu

Employees
Christoph Stöldt

Project period
2006 - 2011

Size
7.300m²

Client
Stadt Isny im Allgäu
Wassertorstraße 3
88316 Isny im Allgäu

Address
Rainstraße, General Moser-Weg
88316 Isny im Allgäu
Deutschland

Show project location on map