State horticultural show - construction management as always: ready on time

Landesgartenschau 01 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

1 / 10

Landesgartenschau 02 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

2 / 10

Landesgartenschau 03 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

3 / 10

Landesgartenschau 04 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

4 / 10

Landesgartenschau 05 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

5 / 10

Landesgartenschau 06 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

6 / 10

Landesgartenschau 07 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

7 / 10

Landesgartenschau 08 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

8 / 10

Landesgartenschau 09 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

9 / 10

Landesgartenschau 10 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

10 / 10

Landesgartenschau 01 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

Landesgartenschau 02 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

Landesgartenschau 03 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

Landesgartenschau 04 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

Landesgartenschau 05 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

Landesgartenschau 06 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

Landesgartenschau 07 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

Landesgartenschau 08 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

Landesgartenschau 09 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

Landesgartenschau 10 © 2008 Martin Schmidt Büro Hink Landschaftsarchitektur

A green corridor in the city connects the historic castle park with the renovated spa park in the east. South on a hill lies the new Salinenpark.

Along the green corridor accompanied by a stream, an attractive green corridor with children's play and seating facilities has been created and with connections to the inner-city squares and places.

In the spa park, the spa lake was renovated, modernized and attached to the spa house. Intensive design with planting areas and playgrounds gradually transitions from there to an extensive design of the spa park, which ultimately flows into a landscaped green corridor.

A newly designed underpass and a stair tower with elevator and footbridge lead across the existing railway line into the newly created Salinenpark, which takes up the basic features of a former historical park and makes salt the theme.

Services:
Competition 2nd prize and construction management

Competition 1st prize and planning
AG Freiraum GbR, Freiburg
Jochen Dittus

Read more +

Planning offices

Büro Hink Landschaftsarchitektur GmbH
Schwaigern (weiterer Standort Sindelfingen)

Project period
2006 - 2008

Size
22,5 ha

Client
Landesgartenschau Bad Rappenau 2008 GmbH

Address
Salinenpark
74906 Bad Rappenau
Deutschland

Show project location on map

Project type
Parks and green spaces
Garden exhibitions