Entwurf © 2005 BAL
Blick über den Main auf die Süwag © 2013 SP BAL
Vorplatz mit Anschluss zum Brüningpark © 2013 SP BAL
Sitzelement © 2013 SP BAL
Anschluss Brüningpark © 2013 SP BAL
Blick in den Innenhof © 2013 SP BAL
Innenhof © 2013 SP BAL
With the new construction of the SÜWAG AG administration building, an open space is being created on the formerly enclosed power plant site. The Mainufer and the neighbouring Brüningpark will be connected via new pathways. At the intersection of the paths, the forecourt of the new administration building is created. The linear banded paving gives the open space a lively and concise identity, the sculptural seating elements made of exposed concrete were specially manufactured. A Caucasian wing nut marks the transition from the forecourt to the Brüningpark. As a new connection to the Main riverbank, a generous staircase breaks through the old power plant wall.
The light inner courtyard is framed by the transparent facades of the new administration building. The exotic greenery of various bamboo species planted here in a linear arrangement is already visible from the forecourt.
In order to make the meadow areas in front open and friendly, the terrain was slightly terraced towards the Main and the surrounding wall was reduced in height. This provides an unobstructed view of the river landscape from the cafeteria.
Read more +
Planning offices
BIERBAUM.AICHELE. landschaftsarchitekten Part.GmbB
Mainz
Employees
Klaus Bierbaum
Klaus-Dieter Aichele
Burkhard Elfers
Frank Finger
Günter Schüller
Project period
2008
- 2010
Size
9.300 m²
Client
Süwag Energie AG
Address
Schützenbleiche 9-11
65929 Frankfurt-Höchst
Deutschland
Show project location on map
Project type
Open spaces for business and public facilities