Nach der Baumaßnahme © BK
Furt nach der Baumaßnahme © BK
Gefällestufe Dittmannsdorf-Sohlabsturz © BK
Lageplan Eula © BK
landscape conservation plan
South-east of the village of Eula, the complex ecological design of the old course of the Eula, including the reconnection to the straightened Eula and the dismantling of the existing Dittmannsdorf gradient step were planned.
These measures contributed to the near-natural design and the activation of the old course of the Eula, including the restoration of the ecological watercourse continuity. The old arm located directly south of the straightened Eula was reintegrated into the course of the Eula. This is to be achieved by dismantling the piping in the inlet and outlet to the old arm and by constructing a prank weir. In addition, the ecological continuity in the straightened Eula is to be restored by the planned reconstruction of the Dittmannsdorf gradient.
Read more +
Planning offices
Büro Knoblich Landschaftsarchitekten BDLA/IFLA
Zschepplin
Project period
03/2008
- 03/2009
Size
7 ha
Client
LTV, Betrieb Elbaue/Mulde/Untere Weiße Elster