Regionallager EDEKA, Lauenau © 2015 Sei LandschaftsArchitekturbüro Georg von Luckwald
Preparation of B-plan, amendment of F-plan for the realisation of a large logistics park on the A 2; planning of storm water management and flood protection
Urban land use planning (incl. environmental report, visibility analysis and 3D visualisation); conception of 6 rainwater retention basins (total storage volume approx. 8,900 m³) as well as a flood retention basin; engineering planning (LP 1-6 HOAI) for traffic and water management measures, compensation, etc.
Supervision and consideration of numerous expert opinions, e.g. traffic expert opinion, noise investigation; design of the stormwater retention basins for a 50-year rain event, connected area approx. 17.5 ha.
Read more +
Planning offices
LandschaftsArchitekturbüro Georg von Luckwald
Hameln
Project period
2009
- 2014
Size
ca. 33 ha
Construction amount
-
Client
Samtgemeinde Rodenberg, EDEKA MIHA
Address
Daimlerstraße 7
31867 Samtgemeinde Rodenberg
Deutschland
Show project location on map
Project type
Watercourse development, flood protection
Land use and development planning