Farbenspiel Eingangsbereich Schule Mitte FFB © 2015 Andreas Rockinger Rockinger Landschaftsarchitektur
Eingangsplatz Schule Mitte FFB © 2015 Andreas Rockinger Rockinger Landschaftsarchitektur
Verkehrsberuhigte Straße und Eingangsplatz Schule Mitte FFB © 2015 Andreas Rockinger Rockinger Landschaftsarchitektur
Pausenplatz Schule Mitte FFB © 2015 Andreas Rockinger Rockinger Landschaftsarchitektur
Pausenplatz Ausschnitt Schule Mitte FFB © 2015 Andreas Rockinger Rockinger Landschaftsarchitektur
Platzfläche im Vorfeld der Sporthalle: Promenadenplatz © 2015 Andreas Rockinger Rockinger Landschaftsarchitektur
Verkehrsberuhigter Ausbau Theresianumweg © 2015 Andreas Rockinger Rockinger Landschaftsarchitektur
Ausbau Promenade im Anschluss an Niederbronner Platz (Quartiersmitte, Realisierung 2010) © 2015 Andreas Rockinger Rockinger Landschaftsarchitektur
Verbindende Fußwege im Quartier: Ausbau Promenade West © 2015 Andreas Rockinger Rockinger Landschaftsarchitektur
Lageplan Gesamtmaßnahme © Andreas Rockinger Rockinger Landschaftsarchitektur
As part of the further development and upgrading of the eastern inner city of Fürstenfeldbruck, the outdoor facilities for the primary school and a grass playing field at the sports hall, the creation of a square area in front of the sports hall, the expansion of the connecting footpaths in the neighbourhood and the new development of Theresianumweg as a traffic-calmed area will be carried out in the vicinity of the neighbourhood square created by 2010 by mid-2014.
The outdoor facilities for the completely renovated and reorganized school building with day care center and archive, include recreation areas for small children, a central break area for the school children, a large forecourt at the main entrance, a small square in front of the archive and day care center entrance and the access areas for cars, bicycles and outbuildings.
The break area is enclosed on two sides by the existing building and opens to the south and west to the adjacent public square and path areas. The characteristic high-quality tree population on the square extends into the break area and thus enables a high quality of stay through shaded areas and spatial frames already at the beginning of the school operation.
The elements of the break areas, such as play area, seating, play and climbing areas, the outdoor class formed as a theatron and the lawns and garden beds are framed and designed by a colorful mixture of different natural stone and asphalt surfaces, paving lines and edges.
Read more +
Planning offices
Studio Rockinger Landscape Architecture
München
agw Anna Gabriele Werner Landschaftsarchitektin
Anna Gabriele Werner
München
Employees
Sarah Geißler
Further planners involved
Vorbereitende Planung, Stadtplanung
Martina Schneider stadt-raum-planung, München
Martina Schneider
München
Stadtplanung
Planungsbüro Skorka, Neuried / München
Manuela Skorka
Neuried / München
Sanierung Hochbau
Arbeitsgemeinschaft Stollenwerk Wellnhofer Architekten
Project period
2011
- 2015
Construction amount
1.100.000 EUR
Client
Bauamt Fürstenfeldbruck
Address
Theresianumweg 1
82256 Fürstenfeldbruck
Show project location on map
Project type
Squares, promenades, pedestrian areas
Traffic facilities