New construction of primary and secondary school at the Unterhaching sports park New construction of outdoor facilities and sports areas

Eingangsplatz © 2014 Andreas Rockinger Rockinger Landschaftsarchitektur

1 / 8

Mensa-Außenbereich © 2014 Andreas Rockinger Rockinger Landschaftsarchitektur

2 / 8

Pausenplatz © 2014 Andreas Rockinger Rockinger Landschaftsarchitektur

3 / 8

Haupteingang zur Eröffnung © 2014 F. Aichele Obermeyer

4 / 8

Sportflächen © 2014 Andreas Rockinger Rockinger Landschaftsarchitektur

5 / 8

Ansicht Pausenplatz vor der Sporthalle © 2014 Andreas Rockinger Rockinger Landschaftsarchitektur

6 / 8

Detail Lesehof © 2014 Andreas Rockinger Rockinger Landschaftsarchitektur

7 / 8

Lageplan Entwurf © 2011 Andreas Rockinger Rockinger Landschaftsarchitektur

8 / 8

Eingangsplatz © 2014 Andreas Rockinger Rockinger Landschaftsarchitektur

Mensa-Außenbereich © 2014 Andreas Rockinger Rockinger Landschaftsarchitektur

Pausenplatz © 2014 Andreas Rockinger Rockinger Landschaftsarchitektur

Haupteingang zur Eröffnung © 2014 F. Aichele Obermeyer

Sportflächen © 2014 Andreas Rockinger Rockinger Landschaftsarchitektur

Ansicht Pausenplatz vor der Sporthalle © 2014 Andreas Rockinger Rockinger Landschaftsarchitektur

Detail Lesehof © 2014 Andreas Rockinger Rockinger Landschaftsarchitektur

Lageplan Entwurf © 2011 Andreas Rockinger Rockinger Landschaftsarchitektur

The new school site is located on undeveloped, formerly agricultural land south of the sports park Unterhaching, in the neighborhood of residential development and kindergarten.

The central break area connects the school and sports hall as the main movement area. Four themed courtyards at the school building and an elongated grove of trees along the north side structure the outdoor areas. The sports areas (all-weather pitch, long jump, running track) and the functional areas (bicycle parking and equipment shed) are grouped together in the north along the site boundary. The parking spaces at the sports park are shared.
The main entrance area in the north is designed as a representative entrance. A grove of trees acts as a spatial 'filter' between the functional areas (running track, bicycle storage area) and the apron of the school with entrance area. The tree grove, covered with small- and medium-crowned trees, also serves as a quiet recreation area for the use of the break.

The differently designed courtyards, refectory courtyard as an outdoor seating area, work courtyard, reading courtyard and art courtyard, can be used as an extended break area or as part of the lessons as an outdoor class.

Read more +

Information on external websites

Website der Schule

Planning offices

Studio Rockinger Landscape Architecture
München

KRUG GROSSMANN ARCHITEKTEN Gesellschaft von Architekten und Ingenieuren mbH
Sven Grossmann, Stefan Lippert, Marcus Vollmann, Peter Franck, Prof. Jürgen Krug
München

Employees
Planung: Veronika Weidemann; Objektüberwachung mit Helmut Rösel

Project period
2010 - 2015

Size
12.000 m²

Construction amount
brutto ca. 1.1 Mio €

Client
In Zusammenarbeit mit Krug Grossmann Architekten
Bauherr: Gemeinde Unterhaching

Address
Anton-Troppmann-Weg 1
82008 Unterhaching

Show project location on map

Project type
Open spaces for business and public facilities