Konzept © 2016 Barbara Kroll
Zustand des Schulgeländes vorher: stark vernässter Lehmboden, austretendes Hangwasser und abschießendes Oberflächenwasser schränken eine Nutzung stark ein. © 2016 Barbara Kroll
Wildblumenwiese auf nährstoffreichem Lehmboden im 2. Standjahr im Schulgarten © 2022 Barbara Kroll
Schulteich am Hangfuß und keimende Blumenwiese im April (nach Fertigstellung im Herbst 2020). © 2021 Barbara Kroll
In conjunction with the reorganization of the architecture and the pathways between the building and the open space, the section on the eastern side of the site, which is surrounded by buildings on three sides, will be transformed into a "new center". The dining room on the first floor, which will be fitted with new exterior doors, will be adjoined by a terrace for eating and sitting, which can also be used for school events, e.g. for school introductions and for performances by the theater group or choir. This terrace leads over a step to the new schoolyard.
Other areas will be redesigned as a near-natural area with an orchard, school garden and pond.
The first part of the site with slope modeling, path construction, creation of the school garden with pond and extensive planting was completed at the end of 2020.
The front garden and sports field followed by May 2023.
Read more +
Planning offices
Kroll, Dipl.-Ing., Barbara
Bobritzsch-Hilbersdorf
Employees
Dipl.-Ing. Sabine Siegemund (Freie Mitarbeiterin)
Project period
2016
- 2024
Client
Stadtverwaltung Tharandt
Address
01737 Tharandt