76th Primary School Am Lehmberg, Dresden Pilot project for sustainable construction with certification

Sitzmauer auf der Spielinsel © 2018 Rehwaldt Landschaftsarchitekten

1 / 6

Pausenhof mit Spielinsel © 2018 Rehwaldt Landschaftsarchitekten

2 / 6

Bolzplatz © 2018 Rehwaldt Landschaftsarchitekten

3 / 6

"Bächlein", Offene Regenwasserrückhaltung © 2018 Rehwaldt Landschaftsarchitekten

4 / 6

Retentionsmulde als Schulbiotop © 2018 Rehwaldt Landschaftsarchitekten

5 / 6

Pflanzungen in der Retentionsmulde © 2018 Rehwaldt Landschaftsarchitekten

6 / 6

Sitzmauer auf der Spielinsel © 2018 Rehwaldt Landschaftsarchitekten

Pausenhof mit Spielinsel © 2018 Rehwaldt Landschaftsarchitekten

Bolzplatz © 2018 Rehwaldt Landschaftsarchitekten

"Bächlein", Offene Regenwasserrückhaltung © 2018 Rehwaldt Landschaftsarchitekten

Retentionsmulde als Schulbiotop © 2018 Rehwaldt Landschaftsarchitekten

Pflanzungen in der Retentionsmulde © 2018 Rehwaldt Landschaftsarchitekten

In the west of Dresden, a new elementary school with after-school care and sports hall was built with sustainability in mind. The site is located on a north-facing slope. The two buildings are accessed at the same level via a shared courtyard. This contains the break areas, which consist of both paved and unpaved surfaces. The paved courtyard, which stretches between the buildings, is a place of arrival, connection and recreation at the same time. All the intensive play areas, such as the climbing area and mud playground, are arranged under a light canopy of trees. An accessible seating wall separates the two materialities and also offers the opportunity to sit down.

At the transition to the recreational green areas, some of the rainwater is collected in a small stream and directed to the open rainwater retention areas to the north. These areas create a wide variety of habitats and are also a backdrop and research space for the pupils. There is also a reading garden in the break area, which can also serve as a classroom in the greenery, equipped with two blackboards.

Close to the sports hall there is a football pitch and a 50-metre running track with an integrated long jump facility.

Read more +

Planning offices

Rehwaldt Landscape Architects
Dresden

Employees
Heike Langkutsch, Ulrike Zänker, Kerstin Heidel, Friedemann Gruß

Project period
2013 - 2017

Size
1,5 ha

Client
Landeshauptstadt Dresden, Schulverwaltungsamt, vertreten durch STESAD GmbH

Address
Am Lehmberg 28a
Dresden
Deutschland

Show project location on map

Prices & Awards
Zertifikat für "Nachhaltiges Bauen" Silber

Project type
Playgrounds, e.g. at childcare centers and schools