Exkurs Grünzug Werdersee: Planung © 1984 Planungsgruppe Grün GmbH
Exkurs Grünzug Werdersee: Zufluss Werdersee © B. Pohl Planungsgruppe Grün GmbH
Exkurs Grünzug Werdersee: Freizeit- und Erholungsnutzung © B. Pohl Planungsgruppe Grün GmbH
The renaturation measure of the Hemelinger Weser bank between the commercial Fulda harbour and the sports boat harbour of the Hemelingen water sports club includes the design (uncovering or creation) of a near-natural sand bank with a shallow slope. The transition zone between the water body and the land was restored to a more ecologically valuable condition.
Natural riverbank zones have been created on the former headland between the Weser and Lake Hemelingen, some of which are regularly flooded during normal water levels and develop different biotope structures of the watercourse edge and a floodplain due to changing water levels. Furthermore, a shallow water zone with a near-natural Weser riverbank was created in a partial measure.
Maßnahmen Renaturierung Weserufer Bremen-Hemelingen © Planungsgruppe Grün GmbH
Maßnahme 1: Naturnahes Sandufer nach Fertigstellung © 2012 Planungsgruppe Grün GmbH
Maßnahme 1: Schnitt Herstellung Naturstrand am Fuldahafen © 2011 planungsgruppe grün gmbh
Sandbänke und Flutrinnen/-mulden - Habitatstruktur naturnaher Flachwasserbereiche. © 2012 planungsgruppe grün gmbh
Maßnahme 2/1: Abtrag und Wiederwendung des Bodens © 2012 Planungsgruppe Grün GmbH
Asiatische Keiljungfer (Gomphus flavipes) © Planungsgruppe Grün GmbH
Flussseeschwalbe (Sterna Hirundo L.) - Die Flussseeschwalbe nutzte u.a. bislang schon die Flachwasserbereiche am Westufer des Hemelinger Sees während der Brutzeit als Nahrungshabitat. Der Lebensraum für die Nahrungstiere (Fische, größere Fluginsekten, schwimmende Larven) hat sich nun um ein Vielfaches vergrößert. © planungsgruppe grün gmbh
Maßnahme 2/1: Sandhabitate zwischen Hemelinger See und Weser © 2012 Planungsgruppe Grün GmbH
Maßnahme 2/2: Schnitt Herstellung Weserufer mit Flachwasserzone © 2011 planungsgruppe grün gmbh
Maßnahme 2/2: Herstellung Weserufer südlich des Hemelinger Sees © 2012 Planungsgruppe Grün GmbH
Maßnahme 1: Unterwassersteinwall © 2012 Planungsgruppe Grün GmbH
During the redesign of the Weser shore Rablinghausen in the area of the Weser shore park into an approximately 220 m long near-natural sandy shore, the sandy soils in the renaturation area were removed down to the beach level and applied in the adjacent Weser shore park for terrain modelling (shallow dunes) and development of ecologically valuable sandy grasslands.
Planung vorher - nachher Weserufer Rablinghausen © Planungsgruppe Grün GmbH
Planung Renaturierung Weserufer Rablinghausen © Planungsgruppe Grün GmbH
Situation ehemaliges Weserufer Rablinghausen © 2008 Planungsgruppe Grün GmbH
Naturstrand des renaturierten Weserufers Rablinghausen - Naturnaher Sandstrand und Liegewiese am Weseruferpark Rablinghausen nach Renaturierung. © 2010 planungsgruppe grün gmbh
Herstellung Sandufer Rablinghausen - Entfernung der Steinschüttung oberhalb der mittleren Tideniedrigwasserlinie und Abtrag der anstehenden sandigen Böden bis auf Strandebene. © 2009 Planungsgruppe Grün GmbH
Naturstrand Weserufer Rablinghausen © 2009 Planungsgruppe Grün GmbH
Herstellung der Dünen im Weseruferpark - Geländemodellierung flacher Dünen und Entwicklung ökologisch wertvoller Sandmagerrasen mittels der abgetragenen sandigen Böden im angrenzenden Weseruferpark. © 2009 planungsgruppe grün gmbh
Einweihung des renaturierten Weserufers Rablinghausen © 2009 Bremischer Deichverband am linken Weserufer
Weseruferstrand Rablinghausen - Ein Ort für Stadtteilkultur. © 2009 Bremischer Deichverband am linken Weserufer
Auenrevitalisierung der Mittelweser in Habenhausen - Umgestaltete Uferstrukturen - hier Ausschnitt naturnahe Sandufer mit Flachwasserzone © Planungsgruppe Grün GmbH
Auenrevitalisierung der Mittelweser in Habenhausen - Panorama der Maßnahme © Planungsgruppe Grün GmbH
Auenrevitalisierung der Mittelweser in Habenhausen - Steigerung Freizeit- und Erholungswert © Planungsgruppe Grün GmbH