Campus Schulzentrum © Kristof Lange Dupper Landschaftsarchitekten
Heterogeneous structures in different architectural language and use were created in longer periods: school and sports buildings, secondary school, high school, town hall, indoor swimming pool.
About a master plan, an overarching open space concept is developed, which connects the buildings to a school center.
In partial sections, the following areas of the master plan have been realized so far:
BA 1 forecourt of the town hall
BA 2 open spaces of the new grammar school
BA 3 schoolyard of the secondary school / campus
BA 4 path connection and climbing wall
The design of the open space is carried out in a uniform design language and consistent choice of materials. Through open spaces of barriers and woody structures, new connections and visual relationships could be established, spatial development and orientation improved.
Further information at www.Dupper-LA.de
Read more +
Planning offices
Dupper, Dipl.-Ing.(FH), Anette
Bad Friedrichshall
Project period
2005
- 2008
Construction amount
EUR 800.000
Client
Stadt Eppingen
Show project location on map