Skulptur und Halle stehen im Dialog © Pit Müller
In connection with the renovation of the Hausach town hall, the surrounding park was also redesigned. This was to meet the needs of both the hall and the adjacent high school. A seating area at a rainwater pond was placed in the centre of the park, which was formed by damming the roof water of the adjacent town hall.
Read more +
Planning offices
Dipl.-Ing. Pit Müller
Freiburg i. Br.
Employees
Joachim Sinn (Objektüberwachung)
Sebastian Schmidt (Entwurf, Ausführungsplanung)
Project period
2004
- 2006
Construction amount
ca. € 380.000,--
Client
Stadt Hausach, vertreten durch Herrn Bürgermeister Wöhrle
Address
77756 Hausach
Deutschland
Show project location on map