Watercourse Weiglhof Making water visible

Oberboden abtragen für Wasserlauf © 2014 Stephen Trepesch Trepesch Landschaftsarchitektur

1 / 8

Auslegen der Teichfolie © 2014 Stephen Trepesch Trepesch Landschaftsarchitektur

2 / 8

Auslegen der Steine © 2014 Christopher Trepesch Trepesch Landschaftsarchitektur

3 / 8

Steine fertig ausgelegt - Wasser marsch © 2014 Christopher Trepesch Trepesch Landschaftsarchitektur

4 / 8

Blutströpfchen © 2014 Christopher Trepesch Trepesch Landschaftsarchitektur

5 / 8

Wasserlauf nach Initialpflanzung © 2014 Christopher Trepesch Trepesch Landschaftsarchitektur

6 / 8

unterste Gumpe mit Überlauf in Pflasterrinne © 2014 Christopher Trepesch Trepesch Landschaftsarchitektur

7 / 8

Es plätschert! © 2014 Christopher Trepesch Trepesch Landschaftsarchitektur

8 / 8

Oberboden abtragen für Wasserlauf © 2014 Stephen Trepesch Trepesch Landschaftsarchitektur

Auslegen der Teichfolie © 2014 Stephen Trepesch Trepesch Landschaftsarchitektur

Auslegen der Steine © 2014 Christopher Trepesch Trepesch Landschaftsarchitektur

Steine fertig ausgelegt - Wasser marsch © 2014 Christopher Trepesch Trepesch Landschaftsarchitektur

Blutströpfchen © 2014 Christopher Trepesch Trepesch Landschaftsarchitektur

Wasserlauf nach Initialpflanzung © 2014 Christopher Trepesch Trepesch Landschaftsarchitektur

unterste Gumpe mit Überlauf in Pflasterrinne © 2014 Christopher Trepesch Trepesch Landschaftsarchitektur

Es plätschert! © 2014 Christopher Trepesch Trepesch Landschaftsarchitektur

Water is channelled from a historic well above ground via the newly created watercourse with pools into a cistern. The existing terrain is used for this purpose. A pond liner was laid out for sealing and this was deliberately laid out with dolomite limestones so that a ripple of the water is audible.

In an initial planting, iris, fir frond, arrowhead, bloodwort, marsh marigold, etc. were used. The first creatures such as dragonfly larvae, frogs, yellow fire beetles and water striders have already settled.
As long as the water is not pumped from the well, the water stands in several pools. When the water is running, the overflow flows down a paver gutter through the yard into the cistern and is available for watering. Previously, the water was piped from the well to the cistern via a garden hose. Now, to everyone's delight, the run is openly visible.

Read more +

Planning offices

TREPESCH landscape architecture
Amberg

Project period
2014 - 2014

Address
Heftner Weg 6
92224 Amberg
Deutschland

Show project location on map