On a plot of land measuring approx. 0.5 ha on the Pleichach, the course of the stream will be

to increase its self-cleaning capacity and reduce flooding

diverted and widened.

Two feeding ditches will also be included in the planning.

The landscaping work included earthworks to model a
new section of the streambed.
new section of the Pleichach stream bed over a length of approx. 100 m,

the modeling of a wet or damp hollow as a widening of the new

stream bed, the widening of two temporary water-bearing ditches over a

length of approx. 75 m in total, as well as modeling the surrounding terrain.

Access to the wetland biotope is via the Wü 5 district road between

Oberpleichfeld and Bergtheim.

About 300 m after the end of Oberpleichfeld, the property is

on the right-hand side via a gravel-paved land consolidation path

which merges at the property boundary into an unpaved access road

at the property boundary.

Read more +

Planning offices

Dipl.-Ing. (FH) Jürgen Braun
Boxberg

Project period
2003 - 2004

Size
5.000 m²

Construction amount
25.000 Euro

Client
Gemeinde Oberpleichfeld

Address
Nähe der Kreisstraße Wü 5 von Oberpleichfeld nach Bergtheim

Landkreis Würzburg

Show project location on map

Project type
Biotope network and species protection concepts
Watercourse development, flood protection