On a plot of land measuring approx. 0.5 ha on the Pleichach, the course of the stream will be
to increase its self-cleaning capacity and reduce flooding
diverted and widened.
Two feeding ditches will also be included in the planning.
The landscaping work included earthworks to model a
new section of the streambed.
new section of the Pleichach stream bed over a length of approx. 100 m,
the modeling of a wet or damp hollow as a widening of the new
stream bed, the widening of two temporary water-bearing ditches over a
length of approx. 75 m in total, as well as modeling the surrounding terrain.
Access to the wetland biotope is via the Wü 5 district road between
Oberpleichfeld and Bergtheim.
About 300 m after the end of Oberpleichfeld, the property is
on the right-hand side via a gravel-paved land consolidation path
which merges at the property boundary into an unpaved access road
at the property boundary.
Read more +
Planning offices
Dipl.-Ing. (FH) Jürgen Braun
Boxberg
Project period
2003
- 2004
Size
5.000 m²
Construction amount
25.000 Euro
Client
Gemeinde Oberpleichfeld
Address
Nähe der Kreisstraße Wü 5 von Oberpleichfeld nach Bergtheim
Landkreis Würzburg
Show project location on map
Project type
Biotope network and species protection concepts
Watercourse development, flood protection