Entwurf © 2017 Thomas Gardai I Wankner und Fischer
Freiflächengestaltungslan © I Wankner und Fischer
Überdachte Fahrradstellplätze und Einblick in den Pausenhof © 2020 Thomas Gardai I Wankner und Fischer
Überdachte Fahrradstellplätze und Einblick in den Pausenhof © 2020 Thomas Gardai I Wankner und Fischer
Sitzmöglichkeiten im Pausenhof © 2019 Thomas Gardai I Wankner und Fischer
Pausenhof © 2020 Thomas Gardai I Wankner und Fischer
Spielbereich © 2019 Thomas Gardai I Wankner und Fischer
Sitzmöglichkeit © 2019 Thomas Gardai I Wankner und Fischer
In the course of the new construction of the elementary and middle school in Pfaffenhofen, the outdoor facilities are also being completely redesigned. The concept of the redesign pursues the goal of a harmonious overall image and also a flood-proof design directly on the Gerolsbach.
In addition to the various break yard areas, two courtyards, an outdoor classroom and covered bicycle parking spaces will be created. The gymnasium, which is located on the opposite side of the Gerolsbach, will be connected to the school grounds via a bridge and will lead directly into the front break yard in front of the school, which can be used by the public. The fenced recess yard areas will be designed separately for the elementary and middle school. The middle school recess yard will have a large climbing and play area. A gravel bed for creative play in the elementary school area and tree-lined islands in the flat sand-colored asphalt in the public recess yard take up the design idea of the "school by the stream".
Read more +
Planning offices
Wankner & Fischer
Eching
Other planning stakeholders
Majuntke GmbH & Co.KG Professionelles Grün
Project period
ab 10/2015
Client
Stadt Pfaffenhofen a. d. Ilm
Show project location on map