Munich Primary School, Senftenauerstraße New construction of a 6-stream primary school with a double gymnasium and indoor swimming pool on Senftenauerstraße, Munich

Entwurf - Übersicht © 2019  I Wankner und Fischer

1 / 3

Entwurf - Freier Spielbereich © 2019  I Wankner und Fischer

2 / 3

Vorentwurf - Innenhöfe © 2018 Rebecca Wezstein I Wankner und Fischer

3 / 3

Entwurf - Übersicht © 2019  I Wankner und Fischer

Entwurf - Freier Spielbereich © 2019  I Wankner und Fischer

Vorentwurf - Innenhöfe © 2018 Rebecca Wezstein I Wankner und Fischer

For the replacement of a primary school at the Senftenauerstraße site in Munich, the construction of a new 6-stream primary school with outdoor and sports areas, all-day care with canteen and catering kitchen, as well as a double sports hall and a swimming hall is planned. The planning contract was awarded in the context of a VgV procedure.

The property with trees worth protecting is located in the middle of a residential area and borders on a small public green space. In the course of the measure, the outdoor facilities are also to be renewed. These include, among other things, the entrance area, the pick-up and delivery zone, the playground with traffic course and access paths, the school garden, a playground with sports equipment, outdoor sports facilities with grass playing field, all-weather pitch with long jump as well as a running track, bicycle storage areas, green areas as well as extensive roof greening and roof terrace.

In the course of planning, a flood proof was also to be carried out.

Read more +

Planning offices

Wankner & Fischer
Eching

Project period
ab 11/2017

Client
Landeshauptstadt München, Baureferat – 81671 München

Show project location on map