©
©
©
©
©
©
The 'Grüne Wiese' park begins with an area for resting by a raised steel water disc. The elongated sunbeds next to the water disk invite you to rest with their southern exposure. This is followed by the Kneipp area with a prelude of two arm basins, through which a constant flow of water flows towards the two treading pools. The area around the Kneipp facility is
paved with recycled natural stone paving. Overflowing water flows from the last treading pool through a spiral of natural stone paving towards the center of the spiral, where it disappears into a second steel water disc in the ground.
Read more +
Planning offices
GTL Michael Triebswetter
Kassel
Project period
2010
- 2011
Size
400 qm
Construction amount
120.000 EUR
Address
59759 Arnsberg-Hüsten
Deutschland
Show project location on map