Retention equalization in Forchtenberg-Sindringen

© 2021 Jasmin Beuchlen Roland Steinbach

1 / 4

© 2022 Jasmin Beuchlen Roland Steinbach

2 / 4

© 2022 Jasmin Beuchlen Roland Steinbach

3 / 4

© 2022 Jasmin Beuchlen Roland Steinbach

4 / 4

© 2021 Jasmin Beuchlen Roland Steinbach

© 2022 Jasmin Beuchlen Roland Steinbach

© 2022 Jasmin Beuchlen Roland Steinbach

© 2022 Jasmin Beuchlen Roland Steinbach

The completed construction project in Sindringen includes a newly designed water arm. Predatory trees, rootstocks and sturgeon stones in the river bed are intended to revitalize and renaturalize the watercourse. New woodland planting on the north side, willow planting on the embankments and new meadow seeding were carried out for the greening. The water arm also provides additional retention volume in the event of flooding. Flora and fauna have accepted the new water arm well.

Read more +

Planning offices

Roland Steinbach | Freelance landscape architect bdla
Öhringen

Employees
Jasmin Beuchlen

Project period
2019 - 2021

Size
140m Länge, 6375m³ Aushubvolumen

Construction amount
158.000 € (brutto)

Client
Stadt Forchtenberg

Address

74670 Sindringen-Forchtenberg
Baden-Württemberg, Deutschland

Show project location on map

Project type
Watercourse development, flood protection