Renaturation of the Kyll estuary Joint compensation for various infrastructure projects

Mündungungsbereich im August 2008 unmittelbar vor dem Baubeginn © 2008 Bernhard Heller BGHplan

1 / 9

Erstes Hochwasser während der Baumaßnahmen im Dezember 2008 © 2008 BGHplan

2 / 9

Juli 2009 - sechs Monate nach Abschluss der Baumaßnahmen © 2009 Bernhard Heller BGHplan

3 / 9

Mündungsbereich mit deutlich sichtbaren Altarmen © Bernhard Heller BGHplan

4 / 9

Altarm im Sommer 2010 © 2010 Dirk Uebele Uebele Fotodesign

5 / 9

Mündungsbereich im August 2010 © 2010 Bernhard Heller BGHplan

6 / 9

Herbst in der Aue © Bernhard Heller BGHplan

7 / 9

Der Mündungsbereich im Wandel der Zeit vor der Renaturierung © GeoBasis-DE/LVermGeoRP2013-01-14 http://www.lvermgeo.rlp.de

8 / 9

Die Kyllmündung um 1940 © 1940 unbekannt BGHplan

9 / 9

Mündungungsbereich im August 2008 unmittelbar vor dem Baubeginn © 2008 Bernhard Heller BGHplan

Erstes Hochwasser während der Baumaßnahmen im Dezember 2008 © 2008 BGHplan

Juli 2009 - sechs Monate nach Abschluss der Baumaßnahmen © 2009 Bernhard Heller BGHplan

Mündungsbereich mit deutlich sichtbaren Altarmen © Bernhard Heller BGHplan

Altarm im Sommer 2010 © 2010 Dirk Uebele Uebele Fotodesign

Mündungsbereich im August 2010 © 2010 Bernhard Heller BGHplan

Herbst in der Aue © Bernhard Heller BGHplan

Der Mündungsbereich im Wandel der Zeit vor der Renaturierung © GeoBasis-DE/LVermGeoRP2013-01-14 http://www.lvermgeo.rlp.de

Die Kyllmündung um 1940 © 1940 unbekannt BGHplan

In the 1950s, the meandering course of the Kyll in the estuary near Trier was straightened and the banks were fortified, the old arms, which were covered with floodplain forest, were separated from the course and partly filled in, or they silted up because they no longer flowed through during floods. The areas between the oxbow lakes were used for agriculture.
The estuary area of the Kyll, however, offers ideal conditions for renaturation, as it lies outside of settlement areas. The aim of the 35 ha renaturation is the self-dynamic further development of the estuary area following a one-off intervention in autumn and winter 2008/2009. To this end, the connection of the oxbow lakes to the flowing waters and the creation of their passability, the creation of diverse transition areas between the watercourse and the land and the abandonment of agriculture in the entire estuary area for the development of riparian forests were implemented. With this measure, nature conservation and water management compensation obligations from four different infrastructure projects could be implemented together.

Read more +

Planning offices

BGHplan Umweltplanung und Landschaftsarchitektur GmbH
Trier

Size
35 ha

Client
Zweckverband Wirtschaftsförderung Trierer Tal
Landesbetrieb Mobilität Trier

Show project location on map