Salvador Allende Square in Jena Lobeda East Creation of a new town square with a water basin, a public playground and ball playground, connection to the supra-regional green and path connections

Blick nach Osten mit Wasserbecken und Pergola © 2011 Holgar Ehrensberger

1 / 15

Entwurf © Holgar Ehrensberger

2 / 15

© 

3 / 15

Baumplatz mit Sitzblöcken © 2011 Holgar Ehrensberger

4 / 15

Wasserbecken mit Neptun-Plastik © 2011 Holgar Ehrensberger

5 / 15

Wasserbecken nachts © 2011 Holgar Ehrensberger

6 / 15

Ost-West-Achse © 2011 Holgar Ehrensberger

7 / 15

Bolzplatz © 2011 Holgar Ehrensberger

8 / 15

Spielplatz © 2011 Holgar Ehrensberger

9 / 15

Spielplatz mit Seilzirkus © 2011 Holgar Ehrensberger

10 / 15

Vergrößerter Zugang zur Unterführung der Stadtrodaer Straße © 2011 Holgar Ehrensberger

11 / 15

Neu gestalteter Zugang zur Fußgängerunterführung © 2011 Holgar Ehrensberger

12 / 15

Panorama nach Westen © 2011 Stadt Jena

13 / 15

Detail Pergola © 2011 Holgar Ehrensberger

14 / 15

Detail Mauer © 2011 Holgar Ehrensberger

15 / 15

Blick nach Osten mit Wasserbecken und Pergola © 2011 Holgar Ehrensberger

Entwurf © Holgar Ehrensberger

© 

Baumplatz mit Sitzblöcken © 2011 Holgar Ehrensberger

Wasserbecken mit Neptun-Plastik © 2011 Holgar Ehrensberger

Wasserbecken nachts © 2011 Holgar Ehrensberger

Ost-West-Achse © 2011 Holgar Ehrensberger

Bolzplatz © 2011 Holgar Ehrensberger

Spielplatz © 2011 Holgar Ehrensberger

Spielplatz mit Seilzirkus © 2011 Holgar Ehrensberger

Vergrößerter Zugang zur Unterführung der Stadtrodaer Straße © 2011 Holgar Ehrensberger

Neu gestalteter Zugang zur Fußgängerunterführung © 2011 Holgar Ehrensberger

Panorama nach Westen © 2011 Stadt Jena

Detail Pergola © 2011 Holgar Ehrensberger

Detail Mauer © 2011 Holgar Ehrensberger

The Salvador-Allende-Platz was developed as a square space and part of the district centre with an urban character and is the focal point for linking the districts Lobeda East and Lobeda West.

The connection of the supra-regional green spaces is emphasized by rows of trees and perennial plantings. Furthermore, new sports and play areas were created in the western part. The barrier-free passage between Lobeda East and West additionally creates a connection to the supra-regional cycle path. In order to make the square effect possible, spatial edges were created by raised green areas, rows of trees as well as structural space dividers. The entrance area at the Erlanger Allee is formed by a square planted grove, which merges into the open square area. The square was paved with high-quality concrete slabs in rectangular large format.
The Neptune sculpture by the artist Axel Schulz was placed in the new water basin. The square is illuminated with light steles as well as linear LED strips embedded in the water basin. The entrances to the pedestrian tunnel were widened to provide a better overview.

Read more +

Planning offices

impuls°landscape architecture
Jena

Autotec GmbH
Jena

Employees
Eisenbeiß Elke
Haubenreiser Arne

Project period
2006 - 2010

Size
10.000 m²

Construction amount
900.000 € netto

Client
Stadt Jena, Stadtplanungsamt

Address
Salvador-Allende-Platz
07747 Jena
Deutschland

Show project location on map

Project type
Squares, promenades, pedestrian areas