Urban redevelopment West Sennestadtteich Bielefeld

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

1 / 12

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

2 / 12

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

3 / 12

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

4 / 12

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

5 / 12

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

6 / 12

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

7 / 12

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

8 / 12

© 

9 / 12

© 

10 / 12

© 

11 / 12

Bielefeld Stadtumbau West L-A-E Ehrig © 2010 L-A-E LandschaftsArchitektur Ehrig & Partner

12 / 12

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

Bielefeld Stadtumbau West L-A-E Ehrig © 2012 L-A-E LandschaftsArchitektur Ehrig & Partner

© 

© 

© 

Bielefeld Stadtumbau West L-A-E Ehrig © 2010 L-A-E LandschaftsArchitektur Ehrig & Partner

In order to make the Sennestadtteich pond easier to experience and more present in the public space, the steep embankments were flattened to a mowable gradient. This measure ensures the long-term maintenance of the open space.



The dilapidated bank reinforcement was additionally reinforced in vulnerable areas with a bulbous fill and generally with the use of bioengineering plants.

At the tip of the peninsula, where the architecture of the Sennestadthaus juts out strikingly over the surface of the pond, an inviting boulder beach has been created in place of the washed-up bank. A seating wall to the side of the path provides both a connection and separation from the concrete paved walkway. The lakeside terraces at the Sennestadthaus are designed as public terraces for relaxation, as a viewing platform and as picnic terraces for leisure use. A 39 cm high retaining wall made of artificial stone creates a pleasant atmosphere by the water.

Read more +

Planning offices

L-A-E Ehrig GmbH
Bielefeld

Employees
Dipl. -Ing Christian Hofmann

Project period
2010 - 2011

Size
7.400m²

Construction amount
310.000

Client
Stadt Bielefeld

Address
Sennestadtring
33689 Bielefeld
Deutschland

Show project location on map

Project type
Squares, promenades, pedestrian areas
Parks and green spaces