Redesign of the main square Landsberg a. Lech

Landsberg a. Lech Hauptplatz © 2014 Boris Storz lohrer.hochrein landschaftsarchitekten und stadtplaner gmbh

1 / 19

Landsberg a. Lech Hauptplatz © 2014 Boris Storz lohrer.hochrein

2 / 19

Landsberg a. Lech Hauptplatz © 2014 Boris Storz lohrer.hochrein

3 / 19

Landsberg a. Lech Hauptplatz © 2013 Thorsten Jochim lohrer.hochrein

4 / 19

© 

5 / 19

Landsberg a. Lech Hauptplatz © 2014 Boris Storz lohrer.hochrein

6 / 19

© 

7 / 19

© 

8 / 19

© 

9 / 19

© 

10 / 19

Landsberg a. Lech Hauptplatz © 2013 Thorsten Jochim lohrer.hochrein

11 / 19

© 

12 / 19

© 

13 / 19

© 

14 / 19

© 

15 / 19

© 

16 / 19

Landsberg a. Lech Hauptplatz © 2013 Thorsten Jochim lohrer.hochrein landschaftsarchitekten und stadtplaner gmbh

17 / 19

Landsberg a. Lech Hauptplatz © 2013 Thorsten Jochim lohrer.hochrein

18 / 19

© 

19 / 19

Landsberg a. Lech Hauptplatz © 2014 Boris Storz lohrer.hochrein landschaftsarchitekten und stadtplaner gmbh

Landsberg a. Lech Hauptplatz © 2014 Boris Storz lohrer.hochrein

Landsberg a. Lech Hauptplatz © 2014 Boris Storz lohrer.hochrein

Landsberg a. Lech Hauptplatz © 2013 Thorsten Jochim lohrer.hochrein

© 

Landsberg a. Lech Hauptplatz © 2014 Boris Storz lohrer.hochrein

© 

© 

© 

© 

Landsberg a. Lech Hauptplatz © 2013 Thorsten Jochim lohrer.hochrein

© 

© 

© 

© 

© 

Landsberg a. Lech Hauptplatz © 2013 Thorsten Jochim lohrer.hochrein landschaftsarchitekten und stadtplaner gmbh

Landsberg a. Lech Hauptplatz © 2013 Thorsten Jochim lohrer.hochrein

© 

The main square of Landsberg presents itself as an attractive and inviting city centre for all population and age groups. With its triangular ground plan, distinctive topography and art-historically valuable framing buildings, it is historically and urbanistically a remarkable ensemble. Traffic originating from the 70s with a DTV of approx. 17000 shaped the appearance of the square. The routing of the former federal road took up a lot of space, parking spaces generated parking search traffic, pedestrians squeezed along narrow sidewalks and stopping possibilities were limited to the central "traffic island" around the historic fountain. In 2010, a VOF procedure with integrated competition was carried out, from which the office lohrer.hochrein landschaftsarchitekten und stadtplaner gmbh, emerged as the winner after a public consultation. The wish for an inviting link between the two most important inner-city pedestrian areas was thus fulfilled. The main square will be the focus of attention as a generous link between the pedestrian zone and the banks of the Lech. A referendum held during the design phase confirmed that the intensively further developed design was well received by the citizens of Landsberg.

Project partners / planners

Day und Light Lichtplanung GbR, Munich

Read more +

Information on external websites

Internetseite der Firma lohrer.hochrein landschaftsarchitekten und stadtplaner gmbh

Information zum Hauptplatz

Planning offices

lohrer.hochrein landscape architects and urban planners gmbh
München

Großberger Beyhl Partner GbR
Dipl.-Ing. (FH) Thomas Beyhl und Dipl.-Ing (FH) Roland Großberger
München

Employees
Dipl.-Ing. (FH), Landschaftsarchitekt Axel Lohrer - Gesamtkoordination
Dipl.-Ing. (TU), Landschaftsarchitektin Monika Pfaffelhuber - Projektleitung

Project period
2011 - 2013

Size
10000 qm

Construction amount
3.6 Mio EUR

Client
Stadt Landsberg, Stadtbauamt
Katharinenstraße 1 / 86899 Landsberg

Address
Hauptplatz, Landsberg
86899 Landsberg
Deutschland

Show project location on map

Project type
Squares, promenades, pedestrian areas
Public participation / moderation