RISA Hamburg © Ramboll Studio Dreiseitl
RISA Hamburg © Ramboll Studio Dreiseitl
©
RISA Hamburg © Ramboll Studio Dreiseitl
Hamburg's water management faces major challenges to ensure protection against flooding even in times of climate change. An increase in the amount of precipitation in the winter half-year is forecast, and precipitation will also occur more frequently as heavy rain in conjunction with storms and thunderstorms. At the same time, the trend towards the sealing of surfaces in Hamburg continues. Insebondere Starkregenereignisse can lead then to overloading of the sewage system and the waters and thus to flooding of roads and cellars ... The project is committed to a new way of dealing with rainwater in Hamburg: from life on the water to life with water.
Atilier Dreiseitl has presented the contents of RISA in an understandable form and prepared for dissemination to the public, both at the political level, as well as at the level of citizens and participated in workshops and panel discussions. For the realisation of pilot projects we have selected suitable projects and developed concepts
Read more +
Planning offices
Ramboll Studio Dreiseitl
Überlingen
Employees
Herbert Dreiseitl, Stefan Brückmann, Nora Menzel, Evi Syariffudin
Project period
2011
- 2012
Size
755 km²
Client
Hamburg Wasser, Dep. pf Urban Planning BSU
Address
Hamburg
Deutschland
Show project location on map