Annäherung an den zwischen den Rasenhügeln gelegenen Spielplatz von Süden © 2015 Albrecht Schaal
Spielplatz von oben vom Hügel aus © 2014 Albrecht Schaal
Spielplatz mit dem Durchbruch durch den Erdwall © 2015 Albrecht Schaal
Gesamtanlage mit Kleinkindbereich links © 2015 Albrecht Schaal
Ausführungsplan nach dem Bau © 2014 Albrecht Schaal
Von Norden © 2014 Albrecht Schaal
Spielplatz von Osten Richtung Siedlung © 2014 Albrecht Schaal
Detail des Großspielgeräts © 2014 Albrecht Schaal
The public playground behind a high earth wall was completely renovated. A new, level access route out of the settlement was created through the embankment. The excavated earth was used to fill in the levelled playground somewhat, without, however, abandoning the existing circular shape. The planting supports the design language. With modern playground equipment from Spiel-Bau, which is mainly made of metal, a toddler play area and a section for older children were divided.
Read more +
Planning offices
grün³
Frankfurt/Main
Employees
Caroline Viereck, Sebastian Koch
Project period
2013
- 2014
Size
0,3 ha
Construction amount
180.000 Euro brutto
Client
Stadt Frankfurt am Main, Grünflächenamt
Address
Ende der Waldecker Straße
60433 Frankfurt am Main
Deutschland
Show project location on map
Project type
Parks and green spaces
Playgrounds, e.g. at childcare centers and schools
Impact regulation and compensation