Carl-Friedrich-Gauß Secondary School Pirna-Sonnenstein

Lange Bank © 2017 Steffen Spitzner

1 / 9

Pausenfläche © 2017 Steffen Spitzner

2 / 9

Lange Bank am Pausenhof © 2017 Steffen Spitzner

3 / 9

Blick zum Schulgebäude © 2017 Steffen Spitzner

4 / 9

Asphalt mit Farblinierung © 2017 Steffen Spitzner

5 / 9

Eingangsbereich mit Rampe © 2017 Steffen Spitzner

6 / 9

Laufbahn © 2017 MAY Landschaftsarchitekten

7 / 9

Wiese © 2017 MAY Landschaftsarchitekten

8 / 9

Entwurf © MAY Landschaftsarchitekten

9 / 9

Lange Bank © 2017 Steffen Spitzner

Pausenfläche © 2017 Steffen Spitzner

Lange Bank am Pausenhof © 2017 Steffen Spitzner

Blick zum Schulgebäude © 2017 Steffen Spitzner

Asphalt mit Farblinierung © 2017 Steffen Spitzner

Eingangsbereich mit Rampe © 2017 Steffen Spitzner

Laufbahn © 2017 MAY Landschaftsarchitekten

Wiese © 2017 MAY Landschaftsarchitekten

Entwurf © MAY Landschaftsarchitekten

The planning task consisted in the design of the school open space at the newly constructed school building of the Carl-Friedrich-Gauß secondary school in Pirna-Sonnenstein. The close relationship of the new school building to the existing gymnasium is further developed by the geometry of the access area and the schoolyard in the open spaces. The division of the space is oriented towards the new school building and thus naturally blends in with it.

The access runs orthogonally to the main entrance of the school and allows a short connection between Struppener Street and the building.
The schoolyard adjoins the school building in an easterly direction and is overlaid with the existing trees and shrubs to form a design unit. Along the dividing line between the schoolyard and the green area, a bench made of concrete elements has been erected, which, as a "long bench", offers pupils the opportunity to sit and talk. The surfaces were paved with asphalt, the appearance of which was softened by the application of coloured stripes. The existing trees and shrubs were loosely planted so that the areas remain low-maintenance and can also be walked on by the children.

Read more +

Planning offices

MAY Landschaftsarchitekten
Dresden

Further planners involved
Architekt: Drei Architekten, Stuttgart

Project period
2010 - 2017

Construction amount
660.000€

Client
Große Kreisstadt Pirna - Fachgruppe Bau

Address
Struppener Straße 11
01796 Pirna

Show project location on map

Project type
Open spaces for business and public facilities